Construction of infrastructure for the eastern basin of the acid mine drainage

PROJECT DETAILS

  • Employer TCTA (Trans Caledon Tunnel Authority)
  • Country South Africa
  • Sector ecology and environment, water treatment and sanitation services
  • Area Gauteng, East Rand
  • Contract value 79,300,000 € (2017 Annual Report )
  • Locality Alberton, New Redruth
  • Finished work in 12 2017
  • Partecipation 100%

PROJECT DESCRIPTION

Construction of access roads including improvements to existing roads and  construction roads along pipeline routes. Construction of the AMD abstraction pump station at Grootvlei Shaft 3 to pump AMD to the treatment works including a concrete shaft cap, the superstructure, a 130 ton electric overhead travelling crane and pipeworks