Construction of infrastructure for the eastern basin of the acid mine drainage
PROJECT DETAILS
- Employer TCTA (Trans Caledon Tunnel Authority)
- Country South Africa
- Sector ecology and environment, water treatment and sanitation services
- Area Gauteng, East Rand
- Contract value 79,300,000 € (2017 Annual Report )
- Locality Alberton, New Redruth
- Finished work in 12 2017
- Partecipation 100%
PROJECT DESCRIPTION
Construction of access roads including improvements to existing roads and construction roads along pipeline routes. Construction of the AMD abstraction pump station at Grootvlei Shaft 3 to pump AMD to the treatment works including a concrete shaft cap, the superstructure, a 130 ton electric overhead travelling crane and pipeworks
PHOTO
< Back to all PROJECTS