Project

Building of systems and equipment for the use of the East-West highway – Eastern Lot

close
 

project details

  • Employer ADA (Algérienne des autoroutes)
  • Country Algeria
  • Sector transport, roads and motorways
  • Area El Tarf
  • Contract value € 267,500,000 (Amounting to € 144,500,00 - 2017 Annual Report)
  • Locality El Tarf
  • Status completed
  • Latitude 36.729883

  • Longitude 8.286948
close
 

project description

Completion of the Eastern Lot of the project for the introduction of a toll system on the East-West highway.
The lot includes the stretch between Bordji Bou Arreridj and the border with Tunisia, totaling approximately 400 km. Cmc is the Lead Partner of the ‘G.R.I.E.A.’ temporary association of enterprises.

Main works: restoration of 19 highway junctions construction of 34 service and office buildings for highway maintenance; construction of 22 tollbooths and approximately 120 minor buildings.